clear horizontal spacer
Page banner reading 'US Chemical Weapons Convention Web Site'
  
clear horizontal spacer
clear vertical spacer
INSPECTIONS

Pre-Inspection Briefing
INTERACTIVE PRESENTATION


Pre-Inspection Briefing Second Slide
First Slide   Previous Slide   Next Slide   Last Slide blank button Presentation Table of Contents   Non Graphic Text Version

Slide Two

Although the information on this slide is optional, BIS recommends introductions to ensure all parties involved in the inspection are introduced to their counterparts and to ensure names and titles are properly referenced in the inspection report. The slide should include the names and positions of the U.S. Government Host Team (HT), Inspection Team (IT), and plant site representatives participating in the inspection.

The OPCW inspectors will be identified in the host team notification sent to the plant site prior to the inspection and also by the Advance Team (AT). The AT also will provide the site with a complete list of HT personnel that will participate in the inspection.

Click to Download 1 the Interactive PIB PowerPoint Presentation template.

Note: If would like additional information call BIS at 202-482-1001.


1 PowerPoint iconRequires Microsoft PowerPoint software.

[ TOP ] [ BACK ] [ TOC ] [ OVERVIEW ] [ LESSONS ]
clear horizontal spacer
clear horizontal spacer
This site is sponsored by:
The United States Department of State, Bureau of Arms Control, Verification and Compliance, and
The United States Department of Commerce, Bureau of Industry and Security
Links to external web sites or references to other organizations should not be construed as an endorsement.
Feel free to contact us by e-mailing our  Webmaster.
clear horizontal spacer
Clear window
clear vertical spacer clear vertical spacer
clear horizontal spacer